The only way to Exceed Cost Goals in Half the Time 

Gino Rossi Gino 14131 Safaris Gris B00DQN7GE6 EU 41 - 4ade218




-
by design
while greatly improving
order fulfillment, product families  quality, commercialization. amd growth
New article: Ensuring Research will be Manufacturable See the seminal white paper on  Concurrent Engineering for Challenging Products  

Featured article:

Gino Rossi Gino 14131 Safaris Gris B00DQN7GE6 EU 41 - 4ade218 - thebestdieteverinvented.space

Stopping counter-productive policies before change can start

Read dozens of educational articles on DFM, including:

Gino Rossi Gino 14131 Safaris Gris B00DQN7GE6 EU 41 - 4ade218

 

DFM article,    Concept/Architecture Cost Breakthroughs,   Gino Rossi Gino 14131 Safaris Gris B00DQN7GE6 EU 41 - 4ade218 Time to Innovate;     Design for Growth,      Designing in Quality
,        Saving Cost and Time with Vendor/Partnerships    Product Family Design      
Order Fulfillment in Half the Time
Mass Customization,         Build-to-Order,          Standardization,        
Designing products for Lean Production
Low-cost Machine Control using Linkages     7 Reasons Why "Cost Reduction" after Design Doesn't Work   Half Cost_Solar
Article on Scalability now including how to make research manufacturable..    Results (new bio-page).  
Unique new course
: Concurrent Engineering & BTO for Low-Volume; High-Mix Environments
Compete on price without sacrificing profits or raising profits without raising prices

 

Leading-edge Expertise on DFM & Concurrent Engineering

For the last 25 years,   Dr. David M. Anderson P.E., has been showing companies how to develop low-cost products that
ramp quickly to stable production.

His customized in-house two-day Product Development Seminar has taught hundreds of companies how to use Concurrent Engineering
 
to design products for the best manufacturability, at the lowest possible cost, in half the time to stable production, with the highest
 quality by design using the methodologies summarized in the article on Design for Manufacturability  and published in the
 2014 DFM book, "Design for Manufacturability How to Use Concurrent Engineering to Rapidly Develop Low-Cost, High-Quality Products for Lean Production"  

All DFM & Concurrent Engineering seminars webinars, and workshops are practical and relevant because they are
 customized to the company's products, industry, and volumes.

His Product-Specific workshops immediately apply these principles to new projects as they begin. 

DFM Seminars and workshops show how to commercialize products, which is an important step between Research and Development. 
Commercializtion of research ensures the Development phase will be able to design low-cost, manufacturable products quick
.

To see a one-hour preview of the seminar, email Dr. Anderson to arrange a no-charge
private DFM webinar
for decision-makers or call him directly at 1- 805-924-0100.

His new

Nike Air Max 1 LTR Premium para hombre Trainers 705282 Zapatillas zapatos - Izas Lorient Calzado, Hombre, Marrón, 46 - , Timberland - Botas de cuero para hombre - Nike Free RN H Hombre Zapatillas Running - , Zapatos de hombre Aemember durante la primavera y el Otoño, mano puntadas y cómodos zapatos casuales, zapatos... - , Camper Oruga K100287-003 Sandalias Hombre - , GTX negro Hanwag Zentauri negro Talla:5 - , Adidas Aerobounce St, Zapatillas de Running para Hombre - , Dr Martens Botas Vintage Pascal II (Negro) - , House Of Leather Botas Vaquero Biker de Cuero Ponerse Punta Cuadrada Becerro Longitud Tacón Occidental 07HA-Hi... - Insun - Botas Chukka hombre - , Air Force 1 Foamposite Pro Low - 532461-300 - - , Nike Air Zoom Pegasus 33, Zapatillas de Running para Hombre - , Modello Cherry - Cuero Italiano Hecho A Mano Hombre Piel Borgoña Chukka Botas Botines - Cuero Cuero Suave - Encaje - , Bata 8943233 - Botines Chelsea Hombre - Zapatillas de running 33-FA para hombre, Onyx / Flash Yellow / Chinese Red, 15 M US - Nike Kyrie 4, Zapatillas de Baloncesto Para Hombre - , Xing Lin Sandalias De Cuero Verano Sandalias De Cuero Zapatos De Hombre Zapatos De Hombre Perezoso Personas Jóvenes... - Retro of London - Botas para hombre Plateado plata - Botas Dr. Martens - MAGNUM - Botas LYNX 8.0 SZ, Hombre, Negro, 45 - , La Sportiva Katana Zapatos de escalada 45,5 yellow/blk - adidas Adizero Ubersonic 2 Hombres - , Reef Flex - Sandalias de material sintético hombre - Timberland 6" In Premium WP Boot Kph, Botas Clasicas Unisex Adulto - , Desconocido V 1969 - Jordan - Botas de cuero para hombre de ACG Air Max Goadome profundas Borgo?a / negro 865031-604 tama?o 8.5 - , Xing Lin Sandalias De Cuero El Nuevo Calzado De Playa Hoyo Hoyo Par Estudiante Zapatos Zapatos De Hombre Verano... - NEWROCK NR M.2246 S24 Negro - Botas New Rock - Hombres - ,
DFM webinar is : Leading-edge; customized, Low-cost can reach unlimited audiences anywhere.
        It can be schedulee quickly and allow prople to have time to work between4 four-hour sessions  Timberland Ek Larchmont Ftm_Chelsea - Botas chelsea - , Sendra Boots9491 - Botas Chelsea Hombre - , Asics Running Gt-1000 2 GS - - Unisex niños Morado / Plata , Zapatos De Encaje Al Aire Libre Ocasionales De Negocios Británicos De Los Hombres De Moda - Reebok - Zapatillas de baloncesto para hombre - , Meindl 2844, Botas de Senderismo Para Hombre marrón oscuro Nike Court Lite Cly, Zapatillas de Tenis para Hombre Blanco (White/Black/Medium Grey 100) , Under Armour Curry 3 Hombre US 10 Blanco Zapatillas blanco / azul Callaway CA XFER Fusion - Nike Zapatillas Air Max 90 LTR (PS) Gris - IGI&Co 58001 Botas Mujer Suede Lona Negro 40 - , Asics Gel-Kayano 24, Zapatillas de Entrenamiento para Mujer Rosa (Seashell Pinkwhitebegonia Pink 1701) Högl 5-10 1080, Bailarinas Para Mujer Blanco (Ivory) Ara St. Anton-Stf-Gore-Tex, Botas de Nieve para Mujer Rojo (Brunello 68) , El Naturalista - botas estilo motero Mujer madera , Johannes W. Karielle, Zapatillas de Estar por Casa para Mujer Marrón - Braun (Roble) Geox D Felicity I - Botas Mujer Schwarz (Blackc9999) Dr. Martens - Botas militares, Color Negro (Black) Black , Sebago Plaza II, Mocasines para Mujer Negro (Black Leather) , Vagabond VB-296-4412-487 - Mocasines de Lona para Mujer Negro Negro 4412-487 , New Balance 373, Zapatillas Hombre Negro (Black/Marblehead Blg) Abeba 2230 – 36 Protektor Line – Zapatos de seguridad bajo, Blanco, 2230-36 - , Toggi Suffolk, Botas de Equitación Unisex Adulto Brown (Cheeko) , HORZE Botas de equitación (Camden invierno, color Black(BL), tamaño 38 Black(BL) Mephisto Harmony Sandals Sandalbuck Camel Platinum Skechers Breathe Easy-Lucky Lady, Merceditas para Mujer Gris (Charcoal Ccl) , HH Zapatos de Tacón Bajo de Primavera Literaria Simple Cuadrado de Boca Baja Solo Zapatos Femeninos, segundo,38 segundo NBWE Zapatos Nupciales De La Boda Lentejuelas Stilettos Sexy Boca Baja Impermeable Zapatos De Plataforma Tacones Altos 16 Cm,White-40 White Zapatillas para Mujer Casual Primavera y Verano Otoño Zapatos Casuales Cuero para Mujer Mixed Colors Tie Zapatos para Plataforma Zapatos para Mujer Rojo , Alma en Pena Sandalias y Chanclas Para Mujer, Color Gris, Marca, Modelo Sandalias Y Chanclas Para Mujer V18541 Gris Gris ,

His powerful Steel & Cost Reduction Workshop will apply DFM principle to large, heavy, or
complex parts for major reduction in cost. material usage, weight, skill demands, quality costs,
and build time.
      The workshop will show how to develop low-cost new-generation products or backward-compatible substitute modules
that will replace expensive weldments, casting, or unnecessarily heavy machined parts with more steel-efficient
 parts of assemblies of CNC machined parts that are accurately assembled by various DFM techniques. 

Gino Rossi Gino 14131 Safaris Gris B00DQN7GE6 EU 41 - 4ade218 - thebestdieteverinvented.space

The illustration below shows an example of a common machine frame, which can replace all welded frames,
most of which need to be machined on large "gantry" milling machines to drill mounting holes in the warped frame.

When the cost of steel goes up, bring in the  Steel Reduction Workshop

.   Standardization increases purchasing leverage, simplify supply chain management, reduce part and overhead cost,
enhances flexibility, and cuts the speed and cost of product development efforts.  See article on Standardization

    Mass Customization can build products on-demand that are efficiently customized for niche markets, various countries, or individual customers, as summarized in this site's Mass Customization article and the ASME article: Mass Customization's Missing Link  in the April 2011 issue of Mechanical Engineering Magazine. 

These principles have been published in Dr. Anderson's second book on Mass Customization: published in Dr. Anderson's second book on the subject: "Build-to-Order & Mass Customization; The Ultimate Supply Chain Management and Lean Manufacturing Strategy for Low-Cost On-Demand Production without Forecasts or Inventory"
    Build to order can build any quantity of mass-customized or standard products on-demand without forecasts, batches, inventory, or purchasing delays.  See Build-to-Order article and article on how BTO provides several recession strategies for immediate results with little capital cost.
 
  Product Line Rationalization can rationalize product lines to eliminate or outsource older, low-volume products to immediately increase profits, simplify supply chain management, and free up people to participate early in complete multifunctional product development teams. See Product Line Rationalization  article Gino Rossi Gino 14131 Safaris Gris B00DQN7GE6 EU 41 - 4ade218  


DFM alone may make the difference between being competitive and not succeeding in the marketplace. Most markets are highly competitive, so slight competitive advantages (or disadvantages)
can have significant impact. 
See DFM article 
DFM may make the difference between a competitive product line and, in the extreme, products that are not manufacturable at all. Products fail and go out of production because costs are too high, quality is too low, the introduction was too late, or production couldn't keep up with demand.  These are all manufacturability issues and therefore very much affected by Design for Manufacturability
 

Would you like to  enquire further?

I would be interested in public seminars on Half Cost Products & Design for Manufacturability.

I am interested in customized in-house seminars or workshops on Design for Manufacturability.

I am interested custom remote DFM webinars at 1/3 less cost, no class limit, and flexible modules.

I would be interested in public seminars on Build-to-Order & Mass Customization.

I am interested in customized in-house seminars or workshops on "Build-to-Order & Mass Customization. 

I am interested custom remote BTO & Mass customization webinars at 1/3 less cost, no class limit, and flexible modules.

Name

Title/Position

Company/Division

Phone number

e-mail address

Type of products

Number of different products (SKUs)


Challenges, goals, and opportunities (check all that apply)

Minimizing product cost
Minimizing  product development cost
Fastest time to stable production
Designing in the best quality and reliability right-the-first-time
Fastest build time and throughput time
Designing for Lean Production, Build-to-Order, and Mass Customization
Assured availability of parts, materials, and products
More effective product development process
Growth and ability to meet peak demand
 Other challenges, goals, and opportunities:
 

   To Submit, first enter "12" and hit "Enter" to bypass Robo Filter (required field)

Free BTO book, signed by the - author, for US callers.  Just call Dr. Anderson at 805-924-0100
(after 8:30 am Pacific) for a free assessment of how much these methodologies can help your company

Call Dr. Anderson at 1-805-924-0100 (Pacific Time Zone) to discuss implementing these techniques or
e-mail him at anderson@build-to-order-consulting.com with your name, title, company, phone, types of products,
and needs/opportunities.

             or fill out the form at the bottom of www.design4manufacturability.com/implementation

Contact Dr. David M. Anderson, fASME, P.E., CMC
HalfCostProducts.com
www.design4manufacturability.com
phone: 1-805-924-0100
fax: 1-805-924-0200
e-mail: anderson@build-to-order-consulting.com

 

copyright © 2018 by 221607
246180
703055
1602858
9544373
10519992
11796911
17182590
17423778
David M. Anderson

Book-length web-site on Half Cost Products: www.HalfCostProducts.com

[DFM Consulting]    [DFM Seminars]  [DFM Webinars]   [DFM Books]    [Credentials]    [Clients]   [Site Map

[DFM article]     [Half Cost Products site]   [Standardization article]   [Mass Customization article]   [BTO article]   [Rationalization article]

Design for manufacturability ( DFM ), standardization & cost reduction techniques can cut total cost in half while improving quality & lead time! Practical consulting, seminars, articles & books.